Selection and performance calculations pile-driving equipment

Grounds and foundations, underground structures
Authors:
Abstract:

Various selection criteria pile driving equipment (hammers and copra), corresponding to the specific conditions of the construction in this article. The same calculation is piling operational performance, taking into account the conditions of construction.In conclusion, pile-driving equipment is selected, the corresponding operating performance determined (calculated and regulatory) and the time of performance.