Preparatory stage of reconstruction of heating system in Peter the Great St. Petersburg Polytechnic University

Heat supply, ventilation, air conditioning, gas supply and lighting
Authors:
Abstract:

The preparatory stage of the reconstruction of the heating system of SPbPU campus, according to the requirements Federal Law No. 261-FZ of the Russian Federation "About energy saving and increase of power efficiency"is discussed in this article. Is now actually attending to energy efficiency of buildings and optimize energy consumption. The article concluded that the need for energy conservation measures on campusand also has been defined plan for further work to implement the program of reconstruction.