Connection of BIM Uses within the investment project

Technology and organization of construction
Connection of BIM Uses within the investment project
Authors:
Abstract:

The BIM technology as management of information on life-cycle of an object based on his model have applied within BIM Uses (processes of use of BIM technology to specific goals of the investment and developer project). If BIM Uses are disconnected to each other within investment and developer project, technological processes will be broken and productivity will be lost. The lack of communications is a result of insufficient study of BIM Uses. The existing publications don't do not measure of specification of BIM Uses to the necessary level at which concrete processes and tools for their realization are clear. The article considers classification of BIM Uses with codification system. One of the main features of classification that it allows to see completeness and border of application of BIM, including blind spots. Possible BIM Usess described on the example of the residential block and then they unite in the map of scenarios of this project on the basis of which the general BIM Uses of the project with all possible communications is formed. In writing the EIR, developer must focus on the general BIM Uses. By way of conclusion, the last part gives an overview of applicability of the algorithm for investment and developer project. Further investigation aimed at generalization and formalization of this algorithm.