Year: 2014 Issue: 10 (25)
Pages: 146
96 6274
Publication schedule
  • №3 June 2021
    Submission deadline: 30 May 2021
Latest issues

Comparison of SCAD Office and LIRA-SAPR on the example of calculation of communications tower

Building constructions, buildings and structures
  • 27
  • 691
  • Pages: 7-21

Air exchange organization in ski tunnels

Engineering and construction of roads, subways, airfields, bridges and transport tunnels
  • 5
  • 602
  • Pages: 22-36

New gypsum-based plaster mortar by UNIS

Building Materials
  • 4
  • 562
  • Pages: 37-49

Using of approximating surfaces for the executive surveys of building constructions

Monitoring and testing of buildings and structures
  • 6
  • 579
  • Pages: 50-59

Comparative analysis of metal reinforcementand fibre-reinforced plastic rebar

Building constructions, buildings and structures
  • 17
  • 557
  • Pages: 60-72

Analysis of the project ISOVER Multi-Comfort House

Energy efficiency and thermal protection of buildings
  • 4
  • 503
  • Pages: 73-87

Facade system "Polialpan" and its application

Building constructions, buildings and structures
  • 6
  • 575
  • Pages: 88-97

Experimental comparison of the characteristics of water vapor permeability of the main construction materials

Building Materials
  • 7
  • 542
  • Pages: 98-108

Features of designing three-layer external walls

Building constructions, buildings and structures
  • 9
  • 575
  • Pages: 108-122

Financial risk insurance while participating in shared investment construction of other real estate

Technology and organization of construction
  • 2
  • 509
  • Pages: 123-133

The quality of the visual inspection of buildings and structures, and the method of its execution

Monitoring and testing of buildings and structures
  • 9
  • 579
  • Pages: 134-146